Project Scheduling App

Last updated at: 26/10/2018 09:42 AM

Project Scheduling App

Project Scheduling App

It is one of the aspect of project management software that requires attention. Without the use of project scheduling applications, scheduling the tasks might be difficult as regards the efficiency of complex software is used by project managers to simplify their work and not worsen it.

project scheduling applications are remarkable and stand out as a primary unit within online project management plan. Project managers utilize project scheduling applications to demonstrate and assign project tasks to people, and explain how exactly the tasks should be carried out.


It is an important component of the project planning and it is used to connect project tasks with the required resource that will be used to complete projects. list of tasks and deliverable with an initial starting date and the time expected to complete the project. The lowest level element is called deliverable s and deliverable s cannot be further divided.

Project Scheduling App

Also, the project schedule is responsible for providing project teams, with a pathway that explains how the project should be executed and provide a reference point that can be used to tracking the development of a project and managing changes to achieve the required objective. The team commits themselves to perform tasks if it is listed it is used by project managers to bring the team and project under management. This is cannot be done without using a good scheduling app like CONSYSA.

A few important steps must be considered when establishing project scheduling application :

The first step in developing a project schedule is to create a logical sequence in which the project tasks are to be executed. A dependency is generated between two or more task so that the execution a particular task cannot take place without the execution a previous task before it has it is arranged in the project schedule.


The next step is to assign resources that would be needed to get the work done on time. a resource may be human resources (Manpower), equipment resources (machine, tools) or Material resources(Raw materials) that will be required by the project. the schedule might be adjusted in time based on the availability of project schedule.

Project Scheduling App

The project manager must indicate the time required to complete each of the tasks immediately after dependencies are established and resources have been assigned.


Project scheduling application houses a range of scheduling tools that are used to create, track, and manage The tools include:

Gantt Chart

Gantt chart is a scheduling tool in form of a horizontal bar chart plotted against time which might be days, week, or months. A bar on a Gantt chart represented an activity that has occurred and its length is based on a time estimate. The bars may be consecutive or run in parallel depending on the availability of resources and task dependencies.


Schedule Network Analysis

The schedule network analysis is a graphical representation of coherent relationship between all the elements of work from the project initiation to the close of the project.regular network analysis of this network diagram is always a standard to check if a project is progressing on the right track.



Critical Path Method

The critical path of a project is the successive chain of activities that consume a lot of time before it reaches its completion putting in mind any dependencies that might exist between two tasks in the sequence.

The critical path method can be determined by adding up the times of all activities on the critical path which is the fastest time that the project can be completed .


PERT (Program Evaluation and Review Technique)

The different between PERT and critical path method is the way the times are calculated for activities. This allows us to check the degree of variation or uncertainty. There are three estimates that are obtained which are the shortest time, the longest time, and the most likely time. The average of these three estimates gives the estimate assigned for each activity.

A good application must contain the set of tools to create a good project schedule. CONSYSA is a project scheduling application that comes with a range of scheduling tools such as Gantt chart, PERT, and so on. This project scheduling tools enable construction project managers, contractors, home builders to create a good project schedule. If you a construction expert, you should adopt CONSYSA to help you produce an effective project schedule.


Click Here For The Summary Video Of This Article

Don't see your question here? Let's talk.

We'll help you find the plan that's right for you.

1-(908) 200-2020

People in all over United States think CONSYSA is best cloud project management system and we think you will too.

Free For Life
loading...